UTHM Batu Pahat


6.9 MWp
Parit Raja, Johor Bahru

Problems encountered

The project has 26 smaller systems at different buildings/ areas. These multiple buildings have to be integrated into one larger system due to Zero Export function requirement as per Suruhanjaya Tenaga self-consumption guideline.

The challenge is to have a main system control that can specifically instruct and control individual smaller systems to the Zero Export function requirement.

How do we solve it?

By proposing an additional Master-Slave system control solution.

A master controller will receive input on how much consumption is needed at the premise, and thus control each and every individual system generation to match the required consumption.

Impact/result

The system generation can be controlled regardless of the number of smaller systems to avoid export to grid and also non-compliance to ST self-consumption guideline.